Dear Robin,
Ensure the date 01.07.2013 is assigned for
Costing Date from, Qty structure Date and valuation date and check if the system is calculating the
price correctly.
Regards
Mangalraj.S
Dear Robin,
Ensure the date 01.07.2013 is assigned for
Costing Date from, Qty structure Date and valuation date and check if the system is calculating the
price correctly.
Regards
Mangalraj.S